
Wire Rope Length 150m 15T Industrial Electric Winch
Contact Person : Iris
Phone Number : +86 19939938244
WhatsApp : +8619939938244
Minimum Order Quantity : | 1 set | Price : | USD 1000-USD3000/set |
---|---|---|---|
Packaging Details : | High quality plywood crate | Delivery Time : | 15 days after receiving deposit |
Payment Terms : | L/C, T/T, Western Union | Supply Ability : | 100 set/per month |
Place of Origin: | China | Brand Name: | SILENCE |
---|---|---|---|
Certification: | ISO CE | Model Number: | JKD |
Detail Information |
|||
Control Method: | Pendent Control Or Remote Control | Type: | Liftling Equipment |
---|---|---|---|
Side Magnetic Braking Device: | Braking Safety When Power Cut Off | Color: | Customized |
Power Supply: | 380V 50Hz Three - Phase Or Customized | Hook Material: | High Class Alloy Steel With 360 Degree Rotation |
High Light: | 1.5T Electric Wire Rope Winch,5KN Electric Wire Rope Winch,1.5T electric strap winch |
Product Description
CE Certification Custom Size Industrial Electric Winch 1.5T Indoor Use
Product description:
This series electric winch motor is slow speed electric motor driven gear winch; It is mainly used for hoisting, drag-and-drop, loading cargos, such as all kinds of large concreteconstruction, steel constructions installation and disassembly; The winches are applied to construction company, mine, factory and other installation engineering projects company;
This series winch is mainly used for large and oversize concrete construction of steel installation and disassembly of mechanical equipment. This structural characteristic is wire rope orderly arrangement lifting is safe and reliable. It is suitable for bridge port and road and bridge engineering and large factories and mines engineering equipments
Technical parameters:
Type | Rated load(KN) | Drum Size | Rope | Motor model | Power kw | Rotation Speed r/min | Overall Dimension mm | Total Weight kg | ||||||
Diameter mm | Length mm | Rope Capacity m | Size | Diameter mm | Lifting Speed m/min | length | width | height | ||||||
0.5 T | 5 | 160 | 340 | 200 | 6*19 | 7.7 | 22 | Y100-6 | 1.5 | 960 | 580 | 660 | 350 | 160 |
1T | 10 | 160 | 400 | 200 | 6*19 | 9.3 | 22 | Y132-6 | 3 | 960 | 620 | 780 | 380 | 260 |
2T | 20 | 220 | 480 | 150 | 6*19 | 12.5 | 22 | Y160-6 | 7.5 | 960 | 750 | 780 | 480 | 600 |
5T | 50 | 320 | 900 | 400 | 6*19 | 17.5 | 8 | Y180-6 | 11 | 960 | 1270 | 1500 | 800 | 1400 |
Fixing of electric winch
The winch must be anchored to prevent sliding or overturning during operation.According to the force, there are four kinds of anchoring methods: bolt anchoring method, horizontal anchoring method, pile anchoring method and weight anchoring method.
Electric winch layout
1. Drainage must be smooth and a work shed should be built around the installation location of electric winch.
2. The installation position of the electric hoist should enable the operator to see clearly the command personnel and the lifting or dragging objects.The horizontal distance from the hoist to the installation position of the member shall be greater than the installation height of the member, that is, when the member is hoisted to the installation position, the operator's line of sight elevation shall be less than 45 degrees.
3, in the front of the electric winch should be set up guide pulley, the distance between the guide pulley to the axis of the drum, with groove drum should be not less than 15 times of the width of the drum, that is, the inclination Angle A should not be more than 2 degrees, no groove drum should be more than 20 times of the width of the drum, so as to avoid excessive wear between the wire rope and the guide pulley groove edge.
4, the method of wire rope winding into the drum should be perpendicular to the axis of the drum, the allowable deviation of perpendicularity is 6 degrees, so that the wire rope ring can be arranged neatly, without oblique winding and mutually overlapping extrusion.
Safe Use of electric winch:
1. During installation, the base shall be firmly balanced, the surrounding drainage shall be unimpeded, the ground anchor shall be set up reliably, and a work shed shall be built.The position of the operator should be able to see the person in charge and the object being dragged or lifted.
2, before the operation, should check the hoist and the ground fixed, elastic coupling shall not be loose.Safety devices, protective facilities, electrical lines, zero or ground connection wires, brake devices and wire ropes shall be inspected and used only after they are all qualified.
3, the use of belt or open gear transmission part, should be equipped with a protective cover, the guide pulley shall not use the open plate pulley.
Product display
Packaging and shipping
1. Use the wooden box made of inspection free plates in line with export requirements, and use plywood with a thickness of 9mm-15mm.
2. The wooden box made of solid wood can meet the requirements of export through fumigation and detoxification.
3 boxes board joint is tight, the box board combination is smooth without dislocation, the cloth nail is reasonable, the reinforcement belt is not less than 2, to meet the requirements of the export.
Enter Your Message